ZHANG Dong-dong. Problems and Corresponding Measures in the Construction Process of Intelligent Building Informatization[J]. 2023,(11):99-101. DOI: 10.13655/j.cnki.ibci.2023.11.030.
The paper analyzes the problems of intelligent building equipment and material procurement, construction drawing design review, construction organization design plan optimization and construction site refinement management from the perspective of the construction side, and proposes to strengthen the review and optimization of equipment, materials, drawings and organization design plan in order to effectively promote intelligent buildings to take root in the modern building system.