登录 注册
您当前的位置:
首页 >
文章列表页 >
Exploration on the Construction Scheme of Near-zero Energy Consumption and Near-zero Carbon Smart Park
更新时间:2023-10-23
    • Exploration on the Construction Scheme of Near-zero Energy Consumption and Near-zero Carbon Smart Park

    • Issue 10, Pages: 12-15(2023)
    • DOI:10.13655/j.cnki.ibci.2023.10.003    

      CLC:

    扫 描 看 全 文

  • LIU Yu, WANG Xue-xing, WANG Jian-ping, et al. Exploration on the Construction Scheme of Near-zero Energy Consumption and Near-zero Carbon Smart Park. [J]. (10):12-15(2023) DOI: 10.13655/j.cnki.ibci.2023.10.003.

  •  

0

Views

2

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on the Standard System of Multi-agent Collaborative Smart Park
Research on the Exploration, Application and Promotion of CIM Technology in Smart Parks ——Taking Changsha E-Commerce Industrial Park as an Example LYU Xiao-fei, FU Qian-kai, LU Ying-xi (PowerChina Zhongnan Engineering Corporation Limited)
Research on BIM based Collaborative Work Management Platform for Smart Park Construction
Analysis of the Application of Internet of Things Technology in Intelligent Buildings
Intelligent Building Design in the Development of Smart City

Related Author

No data

Related Institution

Beijing Tsinghua Tongheng Planning and Design Institute Co., Ltd.
中国电建集团中南勘测设计研究院有限公司
Shanghai Investigation, Design & Research Institute Co., Ltd.
Shaanxi College of Communications Technology
Suzhou Construction and Transportation Higher Vocational and Technical School
0