登录 注册
您当前的位置:
首页 >
文章列表页 >
Research on Construction Period Control of the Complex Engineering of BIM-based Large Airport Hub
更新时间:2023-07-14
    • Research on Construction Period Control of the Complex Engineering of BIM-based Large Airport Hub

    • Issue 7, Pages: 117-120(2023)
    • DOI:10.13655/j.cnki.ibci.2023.07.036    

      CLC:

    扫 描 看 全 文

  • LI Kai, LI Lin-gao, MA Lei, et al. Research on Construction Period Control of the Complex Engineering of BIM-based Large Airport Hub. [J]. (7):117-120(2023) DOI: 10.13655/j.cnki.ibci.2023.07.036.

  •  

0

Views

4

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Innovation Demand of Intelligent Manufacturing and Intelligent Construction of Prefabricated Buildings

Related Author

No data

Related Institution

Nanning University
Fujian Jiangxia University
Nanjing University of Science and Technology ZIJIN College
Gansu Construction Investment Civil Engineering Construction Group Co.,Ltd.
Wuhan Surveying-Geotechnical Research Institute Co.,Ltd. of MCC
0