登录 注册
您当前的位置:
首页 >
文章列表页 >
BIM-based Digital Twin Method for the Full Life Cycle of Data Center
更新时间:2022-04-15
    • BIM-based Digital Twin Method for the Full Life Cycle of Data Center

    • Issue 2, Pages: 132-134(2022)
    • DOI:10.13655/j.cnki.ibci.2022.02.038    

      CLC:

    扫 描 看 全 文

  • Si-yuan WANG, Qiang ZHAO, Hai-chao LIU, et al. BIM-based Digital Twin Method for the Full Life Cycle of Data Center. [J]. (2):132-134(2022) DOI: 10.13655/j.cnki.ibci.2022.02.038.

  •  

0

Views

6

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on BIM based Collaborative Work Management Platform for Smart Park Construction
Design of the Intelligent Building System Platform of Digital Twin
Research on the Application of Lean Construction Concept in Prefabricated Residential Building Projects
Research and Application of Demolition Land Management System Based on BIM+GIS

Related Author

No data

Related Institution

Shanghai Investigation, Design & Research Institute Co., Ltd.
C+E Center for Engineering Research Test and Appraisal Co.,Ltd
State Grid Anhui Electric Power Co.,Ltd.Information & Telecommunication Branch
Shanghai Zhenhua Port Machine Company
Shanghai Far East Water Transport Engineering Construction Supervision and Consulting Co., Ltd.
0