登录 注册
您当前的位置:
首页 >
文章列表页 >
Transmission line Risk Assessment and Optimization Scheduling Considering the Uncertainty of Distributed Power Supply
更新时间:2026-01-13
    • Transmission line Risk Assessment and Optimization Scheduling Considering the Uncertainty of Distributed Power Supply

    • 智能建筑与智慧城市   Issue S2, Pages: 475-477(2025)
    • DOI:10.13655/j.cnki.ibci.2025.S2.148    

      CLC: TM75
    • Published:30 December 2025

    移动端阅览

  • ZHU Feng. Transmission line Risk Assessment and Optimization Scheduling Considering the Uncertainty of Distributed Power Supply[J]. 智能建筑与智慧城市, 2025, (S2): 475-477. DOI: 10.13655/j.cnki.ibci.2025.S2.148.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The Importance and Countermeasures of Risk Management in Construction Project Management
Three-dimensional Maintenance Model for Transmission Lines and Live-line Operations
Investment Decision-making Method for Multi-energy Complementary Power Grid Infrastructure Projects and Its Application in the Field of New Energy
Ressearch on the Application of AI-Based Recognition Algorithm for the Detection of Exterior Wall Damage of Urban Buildings
Whole Process Dynamic Control of Construction Cost Risk Based on BIM Technology

Related Author

REN Shao-hua
LIU Hong-xia
YANG Wen-long
WU Xiao-xu
HU Jia-wei
ZHANG Xiao-juan
LI Lin-pei
WANG Tao

Related Institution

Guangdong Guangjin Construction Engineering Co., Ltd.
Qinghai Power Transmission and Transformation Engineering Co., Ltd. Transmission and Transformation Maintenance Branch (Emergency Repair Center
State Grid Shanxi Power Co., Ltd. Changzhi Power Supply Branch
Smart City (Hefei) Standardization Research Institute Co., Ltd.
Anhui University
0