登录 注册
您当前的位置:
首页 >
文章列表页 >
Research on the Dynamic Control of Labor Resources in the Construction Stage of Housing Construction Based on Intelligent Construction
更新时间:2026-01-13
    • Research on the Dynamic Control of Labor Resources in the Construction Stage of Housing Construction Based on Intelligent Construction

    • 智能建筑与智慧城市   Issue S2, Pages: 377-379(2025)
    • DOI:10.13655/j.cnki.ibci.2025.S2.116    

      CLC: F249.2;TU17
    • Published:30 December 2025

    移动端阅览

  • GUO Qin-zhong. Research on the Dynamic Control of Labor Resources in the Construction Stage of Housing Construction Based on Intelligent Construction[J]. 智能建筑与智慧城市, 2025, (S2): 377-379. DOI: 10.13655/j.cnki.ibci.2025.S2.116.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on the Technological Development and Application Innovation of Fire Alarm Systems
A Brief Discussion on the Construction Plan for Green and Smart Campuses in Primary and Secondary Schools
Future Development Trends of Building Intelligence
Research on the Application of AI Technology in Intelligent Buildings
Research on the Condition Monitoring and Intelligent Maintenance Technology of Transmission Equipment Based on the Internet of Things

Related Author

YE Guo-li
LIANG Qing-zhen
FENG Xin-mao
CHENG Tao
ZHAO Feng-yin
ZHANG Xiao-wei
GAO Bin
YUAN Shan

Related Institution

Shenzhen Chazhi Technology Co., Ltd.
YMME Consultant Ltd.
Suoer Group Co., Ltd.
Shenzhen Xinda Infrastructure Construction Group Co., Ltd.
State Grid Shandong Electric Power Company,Zaozhuang Power Supply Company
0