登录 注册
您当前的位置:
首页 >
文章列表页 >
Analysis of the Construction Management Path of Data Center Building Decoration Under Intelligent Technology
更新时间:2025-08-19
    • Analysis of the Construction Management Path of Data Center Building Decoration Under Intelligent Technology

    • Issue 8, Pages: 134-136(2025)
    • DOI:10.13655/j.cnki.ibci.2025.08.042    

      CLC: TU767;TU71
    • Published:25 August 2025

    移动端阅览

  • YANG Li-xing. Analysis of the Construction Management Path of Data Center Building Decoration Under Intelligent Technology[J]. 2025, (8): 134-136. DOI: 10.13655/j.cnki.ibci.2025.08.042.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on the Application of BIM Technology in the Construction Management of Photovoltaic Power Generation and Solar Thermal Power Generation Projects
Exploration on the Application of Intelligent Technology in Geotechnical Engineering Survey
Practice and Innovation in Smart Campus Design Concepts ——A Case Study of Lingang International Cultural and Creative Campus Project

Related Author

KANG Lin
LIU Fen
LI Shi-quan
HUANG Chun-hua
LI Liang
CHEN Ju-tao
LIN Zhao-rui
ZHU Bi-tang

Related Institution

Gansu Province Installation & Construction Group Co., Ltd.
China Southern Railway Construction Investment Co., Ltd Crcc
Gansu Institute of Urban Planning And Design Company Linited
AECOM
China Railway Guangzhou Group Co
0